Saturday, October 20, 2012

Bushing fitment in locomotive


Audit of following 2 Work Instructions was done in Shop # 19. Report is as follows:-

Fitment of condenser type main bush ( W 19.021):-
Observations:-
  • Use of dummy condensor bushing as mentioned in para 3.3 to para 3.7 of this WI is  difficult practically.

  • These days gel filled bushing are in use for 3-phase locomotives, Hence the WI mentioning use of oil in para 3.12 and 3.13  needs modification.

Fitment of condenser type main bush ( W 19.021):-
Observations:-
  • Flange bolts being used on the roof of LPS make looked rusty, same attended.




  • This WI is incomplete and needs to be re-issued as it does not mention the adhesive tape used in the process of fitment.





2 comments:

  1. Nice Blog.
    We are offering the best and high quality Condenser tapes within your budget.

    ReplyDelete
  2. We specialize in designing, engineering, and manufacturing Double Motion Grease Kettles These kettles play a pivotal role in the production of lubricating greases for various applications, including automobile, aircraft, railroad, and industrial uses.

    ReplyDelete