KNOW LOCOMOTIVES

Indian Railways is constantly striving to give quality inputs towards Electric Locomotive Manufacturing and Maintenance.This blog helps discussion in same.Email me indiwindy@gmail.com.

Flash Banner Now - instant web ads

Wednesday, September 28, 2016

Maintenance Schedules of Locomotives





Posted by Rajesh Gupta at 3:49 AM 2 comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

Monday, September 26, 2016

Hauling Capacity of 3- Phase Locos

Hulage capaity in Tonees at different gradients and different speeds:
 

WAP7


 
WAP5

 
WAG9H

 
WAG9


Posted by Rajesh Gupta at 11:13 PM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Labels: Haulage capacity
Newer Posts Older Posts Home
Subscribe to: Posts (Atom)

2015-16 Loco Production

WAP 4 ( 30)

WAG 7 ( 35)

WAG 9H ( 140 )

WAP 7 ( 58 )

WAP 5 ( 17 )

Total ( 280 )

Loco moves ahead WITH BRAKES !

1. Vacuum to Air Brakes
2. Panel mounted brake system
3. Microprocessor controlled brakes
4. Composite brake blocks
5. Air dryers.

BREAKING DISTANCE DOUBLES WITH 42% INCRESE IN SPEED.

LOCO DISPATCH

Date of dispatch of loco is 65 Calender days after receipt of shell for conventional HH & Raj locos ( WAG 7 & WAP 4).
Date of dispatch of loco is 90 Calender days after reciept of Shell for TP , TG & TPP locos.
Availabity of Traction Motor for locos shall be as D-17 ( HH, TG & TPP), D-18 ( Raj) and D-24 (TP).
Supply of wheel for TP ( D-30), HH,Raj,TG &TPP (D-18).
Supply of equaliser & Comp.beam pins and bushes for HH locos = supply of TM ( D-17).
Date of Receipt of bogie D-15 .

Sites Related To Locomotives

  • Innovations
  • Circulars
  • AC Loco Sheds
  • AC LOCO Details

Monthly IC preparation Record

Monthly IC preparation Record

Popular Posts

  • What are new developments in locomotives?
    Q) Where we got the locomotive technology from? Ans) :-Transfer of technology (ToT) from ABB (Switzerland, Germany & Australia). ...
  • Failure of Axle Box Guide Post
    The guide link it is a forged material. Recently Bhilai Loco shed reported weld failure of Axle Box Guide Post in loco # 31285 ( WAG9). It w...
  • Electric Loco Bogies
    Co-Co Trimount Bogies:- found in WAG 5 and WAM4. Cente Pivot shares 60 % load. Co-Co High Adhesion Bogie: found in WAG7. Sa...
  • Maintenance Schedules of Locomotives
  • WAG-7,WAG-9 & WAP-5 Bogie Fabrication
    ( W 25.010):- What to be ensured:- Spheriblocks being used in WAP-5 Bogies ( 8 in each bogie) should not be of expiry date. Bein...
  • Hauling Capacity of 3- Phase Locos
    Hulage capaity in Tonees at different gradients and different speeds:   WAP7   WAP5   WAG9H   WAG9
  • Field Coil Manufacturing of Traction Motor
    Audit of following WI was done in TM Shop. Report is as follows:- Hitachi  Field Coils( W 23.024):- Points noticed...
  • Hitachi Traction Motor Armature Manufacturing
    Power Coil Winding of Hitachi Armature   ( W 23.017):- Point s noticed:- Source of supply of distance pieces ( high conductiv...
  • How Coils of Hitachi Traction Motor are formed?
    Hitachi Armature Coil Forming ( W 23.009):- Points noticed:- Flattening Jig INJ-016 was being sent for calibration. Hitachi A...
  • Three Phase Traction Motor
    Audit of following Work Instructions was done in TM Shop. Report is as follows:- Assembly of short circuit cage( W 21.404...

3 Phase Bogie-Body measurement format

3 Phase Bogie-Body measurement format

3 Phase Bogie-Body Measurement format, page 2

3 Phase Bogie-Body Measurement format, page 2

M-4

M-4

M-18

M-18

M18 page 2

M18 page 2

M-6

M-6

M-6 page 2

M-6 page 2

3 - phase Loco in pictures

Air Delivery Test

Air Delivery Test

Conventional Bogie Clearances

Conventional Bogie Clearances

Conventional Bogie Clearances page2

Conventional Bogie Clearances page2

Followers

Blog Archive

  • ►  2018 (1)
    • ►  January (1)
  • ►  2017 (7)
    • ►  October (2)
    • ►  September (5)
  • ▼  2016 (7)
    • ▼  September (2)
      • Maintenance Schedules of Locomotives
      • Hauling Capacity of 3- Phase Locos
    • ►  July (5)
  • ►  2015 (8)
    • ►  December (1)
    • ►  November (1)
    • ►  August (3)
    • ►  May (1)
    • ►  January (2)
  • ►  2014 (6)
    • ►  December (3)
    • ►  August (2)
    • ►  March (1)
  • ►  2013 (21)
    • ►  November (3)
    • ►  October (2)
    • ►  August (2)
    • ►  May (6)
    • ►  April (2)
    • ►  March (2)
    • ►  February (1)
    • ►  January (3)
  • ►  2012 (39)
    • ►  December (5)
    • ►  November (5)
    • ►  October (13)
    • ►  September (2)
    • ►  August (2)
    • ►  March (7)
    • ►  February (1)
    • ►  January (4)
  • ►  2011 (2)
    • ►  December (2)

About Me

My photo
Rajesh Gupta
View my complete profile

Search This Blog

Total Pageviews

Awesome Inc. theme. Powered by Blogger.