Locomotive Assembly


Audit of following Work Instruction was done in Shop # 19. Report is as follows:-

Assembly of A panel. Preparation of cable of various sizes ( W 19.040):-
Important point:-
  • This work involves precision and should be done in AC environment.


Assembly of C panel . ( W 19.041):-
important point:-
  • This work involves precision and should be done in AC environment.


Assembly of D panel . ( W 19.042):-
  • This work involves precision and should be done in AC environment.

Assembly of F panel . ( W 19.043):-



  • This work involves precision and should be done in AC environment.



Other Issues:-
Equaliser pins of LMS are being cleared by inspection as a temporary measure in order not to hamper production subject to relaxation of hardness.
This needs to be regularized as it cannot continue forever.