Wednesday, October 10, 2012

How 3 phase loco is assembled?


Audit of following Work Instruction was done in Shop # 19. Report is as follows:-

Assembly of Roof Equipments And Electrical Connections( W 19.048):-
Quality points:-

  • Bolt Tightening work in 3-phase locos can be mechanized as it is monotonous and voluminous job.

  • Quality of welding in the duct welding of OCU should be monitored.

Assembly Of M/C Room Blower & TM Blower ( WI 19.046)


Quality Cheks:-





  • Visual only , the impellor mounting on shaft step as mentioned in WI is no more relevant now as blowers are supplied with mounted impellers only.




No comments:

Post a Comment