Audit of
following 2 Work Instructions was done in Shop # 19. Report is as
follows:-
Fitment
of condenser type main bush ( W 19.021):-
Observations:-
- Use of dummy condensor bushing as mentioned in para 3.3 to para
3.7 of this WI is difficult practically.
- These days gel filled bushing are in use for 3-phase locomotives,
Hence the WI mentioning use of oil in para 3.12 and 3.13 needs modification.
Fitment
of condenser type main bush ( W 19.021):-
Observations:-
- Flange bolts being used on the roof of LPS make looked rusty, same attended.
- This WI is incomplete and needs to be re-issued as it does not
mention the adhesive tape used in the process of fitment.