 Audit of following  Work Instructions was done in Shop # 19. Report is as follows:-

Mounting of SL, MVSL, QVSL ( W 19.023):-
Observations:-
  • Marking of 20 nos holes as mentioned in para 3.1.1 of this WI seems to have become outdated. In practice 12 holes and 4 spigot holes are being done. This WI needs modification.

  • Jig for marking holes is due for calibration got attended.

  • Jig for mrking MVSL is due for calibration got attended.

  • Location of heat-shrinkable sleev as mentioned in para 3.3.4 of this WI was explained to staff.


  • Source of supply of hylem sheet for QVSL mounting could not be idenetified in the shop same done in office.



Loco Assembly in CLW


Audit of following 2 Work Instructions was done today in Shop # 19. Report is as follows:-

Mounting of Battery and connections ( W 19.024):-
Problems rectified on the spot:-
  • In the loco inspected in test shed, some of the batteries having deficient water indicator float were attended.


  • All the battery terminals found to be sulphated got attended.



  • Main cable ( B006) was of smaller size than the battery connector  cable. Attending this anomaly can reduce the cost.


Mounting of Battery and connections ( W 19.033):-




Observations:-
  • In the batteries of M/S Emco make, electrolyte has to be filled up. This work is prone to dust ingress in the shop.

  • In the batteries of M/S HBLmake, hygrometer probe is not usable.


Sunday, October 14, 2012

How pantographs and filter blocks are assembled?


Audit of following  Work Instructionwas done today in Shop # 19. Report is as follows:-

Mounting of Pantograph assembly ( W 19.025):-
Problem under discussion:-
  • As per WI, pantograph is to be mounted when the roof is on the loco, but most of the time, pantograph mounting is done on the floor only.



  • Fasteners of UNBRAKO make appeared rusty.


Assembly of Filter Block ( W 19.038):-



Discussions:-
  • Some copper connectors appeared discolored.

  • Realignment/re-designing of the mounting of hotel load equipments may reduce the workload.



How Locomotive assembly is done?



Audit of following  Work Instructionwas done today in Shop # 19. Report is as follows:-

Assembly of panel HB1 ( W 19.039):-
  • This work involves precision and should be done in AC environment.

Assembly of panel HB2 ( W 19.037):-
  • This work involves precision and should be done in AC environment.




Mounting of Main Compressor ( WI ( 19.036) 




  •  Both ELGI and Feyvelli MCPs were being fitted in the loco.




Saturday, October 13, 2012

Locomotive Assembly


Audit of following Work Instruction was done in Shop # 19. Report is as follows:-

Assembly of A panel. Preparation of cable of various sizes ( W 19.040):-
Important point:-
  • This work involves precision and should be done in AC environment.


Assembly of C panel . ( W 19.041):-
important point:-
  • This work involves precision and should be done in AC environment.


Assembly of D panel . ( W 19.042):-
  • This work involves precision and should be done in AC environment.

Assembly of F panel . ( W 19.043):-



  • This work involves precision and should be done in AC environment.



Other Issues:-
Equaliser pins of LMS are being cleared by inspection as a temporary measure in order not to hamper production subject to relaxation of hardness.