WAG9 loco manufacturing


Defects list sent by TATA shed was studies in the shop recently.

  • Problem of vertical clearance in WAG9H


Vertical clearances were measured again in TG-294 ( loco returned from Gomoh Shed). They are to be attended if found more than prescribed 35 mm. 



Camber measurement with theodolite instrument was observed on TP long beam in the shop .


 



Inspection staff was asked to be very strict in camber measurements and to raise deficiencies in welding as this was highlighted during recent GM’s inspection.

Friday, August 24, 2012

TM tests and WAP-5 bogie


One day  BHEL’s TM failure was analysed with BHEL representative in the shop #18 .


Heavy abnormal sound was observed hence motor was declared unfit for service.


WAP-5 bogie new checksheet’s locations were have been finalised


Deviations are generated regularly for dimensions.



Holes in the brackets were not in the exact centre of the brackets.

In view of these deviations, RDSO has concluded that Gear Case breakage is taking place.


Since exact tolerances are to be  maintained in WAP-5 bogie it is machined on CNC.

Saturday, August 18, 2012

WAG-7,WAG-9 & WAP-5 Bogie Fabrication


( W 25.010):-
What to be ensured:-
  • Spheriblocks being used in WAP-5 Bogies ( 8 in each bogie) should not be of expiry date. Being rubber item, it may not be desirable from residual life point of view.


  • Fixtures for bogie fabrication should be calibrated


Welding by GMAW process ( W 25.002):-
What to ensure:-

  • Lots of spatter which appear after each welding should be avoided.

  • The anti-spatter spray should beused  by staff without fear of flashing. Anti-spatter spray being used should not be of expiry date.



  • WAP-5 bogie fabrication work is to be done on  CNC machine, otherwise Holes are off-centre, dimensions are out of tolerance.


Wednesday, December 28, 2011

Failure of Axle Box Guide Post

The guide link it is a forged material.

Recently Bhilai Loco shed reported weld failure of Axle Box Guide Post in loco # 31285 ( WAG9). It was reported to be a VS ( Ved Sessonica - Kanpur) bogie and failure was reported on inner side of the post-weld frame.