WAG9 loco manufacturing


Defects list sent by TATA shed was studies in the shop recently.

  • Problem of vertical clearance in WAG9H


Vertical clearances were measured again in TG-294 ( loco returned from Gomoh Shed). They are to be attended if found more than prescribed 35 mm. 



Camber measurement with theodolite instrument was observed on TP long beam in the shop .


 



Inspection staff was asked to be very strict in camber measurements and to raise deficiencies in welding as this was highlighted during recent GM’s inspection.