Cab AC ducts were in should be checked for shabby condition.
Make sure Inspection
staff has the fitment drawings of Cab AC ducts.
If not, Same to be
collected from design office.
Problem may be reported regarding gap between mounting brackets of transformer in
three phase locos and should be looked into.
Another
problem should be noted during the inspection:-
See in above picture, you find Long nut here and Small nut there .
Size of the
nut ( check if trade item) should be same . Some nuts can be 3 mm shorter than
others in the same bracket.
If it is reported that the battery box was tag welded then same has to be
run welded in the shed.
Vertical
portion
It is to be seen that not only the battery boxes are mounted on run welded brackets only, the vertical
portion on the bracket should not be left unwelded at any place.
Battery boxes ( which are 100 % trade items ) should be tag welded at
places inside the box?
TM shop should be visited in order to find out condition of brush
insulators and tightness of brush holder pockets.
Complaint of shed that CCPT 16
A fuse was being used in place of 10 A, need examination.
Thanks for sharing such kind of Information. Must visit at Condenser tapes which manufacture and supplier by NTI.
ReplyDelete