Audit of
following Work Instructions was done in TM Shop. Report is as follows:-
Static
Balancing of Armature Stacki ( Before Mounting with Commutator) ( W 23.033):-
Points noticed:-
Points noticed:-
- Gauges used for checking balance are
sent for calibration.
- Static
balancing is being done as sacrosanct process.
Welding
of Mainpole and Compole ( W 21.103):-
Points noticed:-
- Pin Hole checking being done as per para 3.3 of this WI.
- Bead slump measurement is being done as per para 3.4 of this
WI.
- Mild Steel welding is being done in place of Low Hydrogen welding
as prescribed in the para 3.1 of WI.
Another problem in brake hanger bracket failure
was reported by CEE(Loco) during shop inspection, same will be studied in
detail later.