Audit of
following Work Instructions was done in TM Shop. Report is as follows:-
Static
Balancing of Armature Stacki ( Before Mounting with Commutator) ( W 23.033):-
Points noticed:-
Points noticed:-
- Gauges used for checking balance are
sent for calibration.

- Static
balancing is being done as sacrosanct process.
Welding
of Mainpole and Compole ( W 21.103):-
Points noticed:-
- Pin Hole checking being done as per para 3.3 of this WI.
- Bead slump measurement is being done as per para 3.4 of this
WI.
- Mild Steel welding is being done in place of Low Hydrogen welding
as prescribed in the para 3.1 of WI.