Audit of
following Work Instructions was done in TM Shop. Report is as follows:-
Assembly
of short circuit cage( W 21.404):-
Points noticed:-
- Record of the stack length measurement should be taken as
prescribed in para 3.9 and para 3.11 and para 3.15 of this WI.
- Pressing machine gauge for measuring 45T pressure due for
calibration.
- Auxilary pressing ring as mentioned in para 3.14 of this WI being made available in the shop.
- Tightening of nuts as mentioned in para 3.15 of this WI should be done with torque wrenches.
- Source of half rings could not be traced .
TEW make traction link bolt’s lab test report has
come today. Sample has failed the chemical test and passed the hardness test. In CLW quality is paramount.